Built for excavation & grading contractors and the engineers they work with. Answer plain-English jobsite questions, upload your site plan PDF, and download a complete binder built on the official EPA 2022 CGP SWPPP template — editable Word file plus a bookmarked PDF.
Unedited output from our engine for a fictional 2.5-acre site in Manchester, NH.
One-time, no subscription required
EPA 2022 CGP template, filled from your answers
Site plan merged as Appendix II
Coverage trigger, NOI fee & wait before digging
Free to start — you only pay ($299) after your binder passes the readiness check. Results are estimates; confirm with your permitting authority.
Three steps from jobsite details to a printable binder for the site trailer.
Acreage, receiving water, grading phases, operators and inspector — in plain English, about 15 minutes.
Use the drawing from your civil engineer. A readiness check flags anything missing before you pay.
Download the editable .docx and bookmarked .pdf, review it, sign Section 8, and keep it on site.
Coverage triggers (1+ acre or common plan), state NOI fees and pre-dig waits, EPA seasonally dry periods by ZIP code (Table 32), the 7-day inspection requirement for impaired or Tier 2+ waters (Table 47), and the N/A gates for sediment basins, chemical treatment, dewatering and turbidity monitoring are all decided by rule code with automated tests — the same inputs always produce the same binder. You still review and sign every page before filing.
Follows the structure of EPA's official 2022 CGP SWPPP template (CGP Part 7).
Primary operator, subcontractors, 24-hour emergency contact and qualified inspector training.
Coordinates, receiving waters, impaired/TMDL/Tier status, disturbed acreage and construction phases.
Endangered Species Act criterion selection, historic property screening and SDWA underground injection gates.
Natural buffers, perimeter controls, track-out, inlet protection, dewatering and site stabilization.
Fueling, concrete washout, material and waste storage, spill response and sanitary waste.
7-day or 14-day + rain-event schedule, impaired-water escalation and delegation of authority.
Turbidity benchmark monitoring when it applies, and the CGP certification signature block.
Your site plan PDF merged with bookmarks, delegation letter, amendment and grading logs, blank inspection forms.
All three are legitimate ways to meet the permit. The right one depends on your site and your team.
A good fit when someone on your team knows the CGP well and has time to complete the template's tables, look up dry-period months, and assemble the appendices.
A good fit for typical commercial and residential sites where you already have a site plan PDF and want the template completed and assembled consistently.
.docx and merged, bookmarked .pdfThe right choice when your project needs original erosion-control design, sediment basin modeling, a PE/CPESC/QSD stamp, or someone to represent you with the agency.
Working with an engineer already? Many teams use both: the engineer produces the site plan, and SWPPPBinder assembles it into the completed EPA template.
Pay per jobsite. Add inspection logging only if you want it.
Payments processed securely by Stripe. Prices in USD.
No. SWPPPBinder completes and assembles the SWPPP document. If your state, county or city requires an engineer-designed erosion plan or a professional stamp, you still need one — upload that plan and we merge it into the binder.
The permit operator. The binder is built from the information you enter, so review every section, make any site-specific edits in the Word file, and sign the Section 8 certification before you file your NOI.
If your lot is part of a larger common plan of development (such as a subdivision or commercial park) that disturbs 1 acre or more in total, permit coverage and a SWPPP are generally still required before you start.
Sites covered by the EPA 2022 Construction General Permit (New Hampshire, Massachusetts, New Mexico, DC, Puerto Rico and other EPA-administered areas), plus Florida (FDEP) and Michigan (EGLE). See the EPA, Florida and Michigan pages.
Yes. The .docx is unlocked, so you can amend it as the project changes. You also get the merged, bookmarked PDF for printing.
Your answers and uploaded PDFs are stored privately and used only to build your binder. Files are served through download links that expire after 15 minutes. We never see your card details — Stripe handles payment. See our Privacy Policy.
Construction sites covered by a stormwater permit must prepare a SWPPP before submitting the NOI and keep it on site. Clean Water Act civil penalties are inflation-adjusted each year and can exceed $68,000 per day per violation (40 CFR Part 19).
Unedited engine output • fictional 2.5-acre site, Manchester NH • 55 pages
Open the full sample PDF in your phone's viewer.